The tonya

PROJECT TYPE:

Historic Renovation: Attic addition with bathroom added; Primary bathroom addition; renovation of existing 2nd story full-bath

View original concept

IN PARTNERSHIP WITH:

Alyssa Collins - Alyssa Collins Interior Design

DETAILS:


Area: Mesta Park, Oklahoma
Cost to build: 153K
Time under construction: Seven Months


FAMILY MOTIVE:

Homes in Mesta Park are full of charm and challenges.

The first priority was a full bathroom since this 100-year-old home with three bedrooms had only one bathroom on the second floor; a bathroom that this family of five had long since outgrown.

In addition to adding a proper primary bathroom on the second story, the homeowners sought to add even more breathing room by adding a full third story, complete with a full bath, deleting their fourth bedroom in the process.

James Grey Homes took on the design and remodel, joyously celebrating in our favorite traditional esthetic and, boy, were the results simply to die for.

BEFORE WE BEGAN:

Previous
Previous

The Krista

Next
Next

The Steph